→ Private area
Aplitop · Surveying the Future

Support

How is tcpMDT Photovoltaic terrain data transferred to the construction site?

Updated on tcpMDT Photovoltaic

How is data transferred to the terrain for execution?

The software greatly facilitates the transition to the construction site by sending data to data collectors for SETTING OUT LINES in the field. This ensures that the location and Station of each Support are transferred with millimeter precision from the Elevations model to the actual Terrain.

Type your question and pick a product to narrow the results. Use ↑ ↓ and Enter to open an article.