- What is the function of the "Create partial cells on the boundary" option?MDT takes into account the portion of the cell within the boundary instead of ignoring it or processing the entire cell in the calculation…
- Different results when using different volume calculation methods.Of the 3 possible methods for volume calculation, by profile difference, surfaces and mesh, they mainly focus on cross-sections and grid…
- What is the "Station" command used for?To perform a quick calculation of the percentage of Shale. Cut work completed by comparing an Export Points file of representative points…
- What type of objects can "Work Units" be assigned to?They can be assigned to lines, polylines, and point blocks in the drawing.
- What factors are calculated in the "Consumption and Emissions Report"?It calculates environmental factors such as CO2 emissions, fuel consumption, water, energy, and waste generation.
- How does "Curvature Correction" affect volume calculation?It considers the influence of the axis curvature by adding a correction (Cc) to the total volume, based on the curve radius and the…
- What data is included in an "Area and Volume Report" for a segment?It displays the surfaces and volumes of cut slopes, embankments, and topsoil for each PK, including partial and accumulated values.
- What are "Roadbed Layer Measurements"?Once the roadbed layers have been previously defined in the typical cross-section of the segment, this command calculates the surface area…
- What is the main objective of the "Mass Diagram"?Analyze the distribution and movement of earthworks along the road to plan material transfers (compensations, landfills or stockpiles)…
- What is the difference between the AREA AND VOLUME REPORT and the MEASUREMENTS REPORT?the AREA AND VOLUME REPORT is the standard report for tracking the total progress of Manual thickness (with emphasis on Accumulated…
- Summary Table of Area MeasurementsArea List · Determines the developed surfaces involved in the earthworks of a roadway. · Segment · List by Station (PK) of Surfaces…
- Why do ditches appear where none were requested?On a road with assigned ditches, the program may generate ditches on stretches where none were requested. The most common cause is that…