Support
How is a project defined in tcpTunnel?
How is a project defined in the application?
Each project is defined by the HORIZONTAL ALIGNMENT and Front (Elements horizontal and Vertical), the SUPERELEVATIONS and the cross-sections or tunnel templates. This data can be entered manually or converted from CAD DRAWING files.