→ Private area
Aplitop · Surveying the Future

tcpMDT Photovoltaic

Natural terrain - PV25

Updated on tcpMDT Photovoltaic Leer en español

5.1 Natural Terrain

This command allows you to set the surface that is used as the initial terrain or existing ground of the project. This surface will be used for the calculation of cut and embankment volumes of the project, as well as serve as the basis for making the final surface of the project.

Natural terrain - PV25

Optionally, you can also set the surface selected here as the current MDT surface. If a current surface already exists in MDT, you can save the changes to the surface that have yet to be saved by activating the corresponding option before switching to the new current surface.

Type your question and pick a product to narrow the results. Use ↑ ↓ and Enter to open an article.