→ Private area
Aplitop · Surveying the Future

tcpTunnel

Road surface - TNL5

Updated on tcpTunnel Leer en español

8.5 Road Surface

Allows user to set out points over horizontal alignment entering a Station and an Offset. If there is a vertical alignment file in the project, it will be used to calculate the height of the point. Optionally, the user can enter a Thickness value, positive or negative, in addition to the calculated height.

Road surface - TNL5 Road surface - TNL5 (2)

Road surface - TNL5 (3)

The setting out is performed in the same way as in the setting out Points option, appearing in this same chapter.

Type your question and pick a product to narrow the results. Use ↑ ↓ and Enter to open an article.