tcpMDT
In this section
- Area and volume report - MDT25An area&volume report of the new road will be obtained next. To do this, run the command Quantity Takeoff> Volumes> Area and Volume Report…
- Measurements report - MDT25Then, we will obtain some surface and volume lists that will be useful for the calculation of earthworks. Run the command Quantity…
- Setting out lines - MDT25We will set out lines of the road. To do this, run the command Setting Out> Set out Lines (or Setting Out> Road> Set out Lines), select…
- Tour by road - MDT25Before making the 3d tour of the road, we are going to insert vertical signage, to do this, we execute the option Maps > Insert 3D…