tcpMDT
In this section
- Mesh difference - MDT25This command calculates the cut and fill volumes from two mesh files obtained using the Create Mesh from Surface and Create Mesh from…
- Surface difference - MDT25This command is identical to Mesh Difference command, except that it uses surface files as data input instead of mesh files. When the…
- Cross section difference - MDT25This option obtains the volume between two terrains from two cross-section profiles. These should have the same stations defined along the…
- Calculation methods - MDT25There are two different methods to calculate the volume associated to a cut, fill or organic soil. If the Curvature Correction check box…
- Stockpiles - MDT25This tool will make it easier for us to quickly calculate the volume of the different land stockpiles that we may have on a surface. To do…
- [PRO] area and volume report - MDT25This command generates a complete list of the surface areas and volumes in a segment. It displays the cut, fill and topsoil areas and…
- Simple section volumes - MDT25This command will be very useful for calculating the volume of a road with no complex sections, with no need to define everything in…
- [PRO] quick certification - MDT25This command is of great use, since it allows one to rapidly calculate the quantity and percentage of the work executed from a file of…
- [PRO] executed work - MDT25This command operates exactly the same way as Quick Certification, only that instead of requesting a points file to verify the current…
- [PRO] volume report - MDT25In this case, MDT will provide a complete volumes list from a segment. The program initially requests the segment, as well as the initial…
- [PRO] roadbed layer measurements report - MDT25This command calculates the volume of each roadbed layer, as well as of the remaining volume of the cross-sections defined in the segment…
- [PRO] area report - MDT25When this command is executed, a complete report of the areas contained in a specific segment is displayed. MDT initially requests a…
- [PRO] roadbed measurements report - MDT25With this option, the program generates a list of measurements of the selected segment. Initially it requests the segment or road…
- [PRO] platforms measurements - MDT25With this command you can generate a list of the ground or developed areas of the road platform, vector by vector. Initially, it will ask…
- [PRO] cross section measurements report - MDT25This command enables us to obtain two different report types of the length of the elements of the completed road or of the areas developed…
- [PRO] slope measurements report - MDT25As with the previous command, in these cases we can generate a list of the length of the slopes or the area of the same. When selecting…
- Assignment of work units to entities - MDT25This command will enable us to assign works units to significant entities in the drawing. More specifically, we can assign them to both…
- Road works units report - MDT25This command enables us to generate a report on the Work Units of the selected elements. The following items can be selected: Segments…
- Road consumption and emissions report - MDT25This command, as with the previous command, will provide us with a report on the consumption and emissions of the selected elements. First…
- Material execution budget - MDT25This command enables us to calculate a budget for the execution of the selected elements. Each works unit will have a price assigned per…
- [PRO] mass diagram calculation - MDT25The distribution of earthworks throughout the road's route can be analyzed using this option. Also, with a series of tools, the user can…
- [PRO] draw mass diagram - MDT25Next it will optionally request a file to save any type of earthworks that we have been able to make in the road and finally the following…
- [PRO] earthworks - MDT25This command is used to carry out movements of materials between cut and fill, as well as account for the different dumps and stockpile…
- [PRO] dumps - MDT25In this mass diagram option, the different dumps that are available for the road works are listed. When inserting a new one it will…
- [PRO] stockpiles - MDT25In this mass diagram option, the different material stockpile areas available for the road works are introduced. When inserting a new one…
- [PRO] material costs table - MDT25The price of moving material in terms of its displacement in cubic meters, per linear kilometer is introduced in this table. The cost of…