→ Private area
Aplitop · Surveying the Future

tcpMDT

[PRO] copy vertical alignment to terrain - MDT25

Updated on tcpMDT Leer en español

10.24 [PRO] Copy Vertical alignment to Terrain

[PRO] copy vertical alignment to terrain - MDT25

Initially, one is requested to graphically select a vertical alignment. The long section file to be created is then selected. The dialog box then requests the Initial Station and Final Station (with the default values being the values at the ends of the vertical alignment), in addition to the Interval to discretize the vertical transition curves.

[PRO] copy vertical alignment to terrain - MDT25 (2)

Both this option and its opposite are particularly useful for partially or totally processing the theoretical vertical alignments designed, which can be used as future current conditions to design underground conduits.

Type your question and pick a product to narrow the results. Use ↑ ↓ and Enter to open an article.