tcpMDT
In this section
- [PRO] Material Costs Table - MDT26The price of moving material in terms of its displacement in cubic meters, per linear kilometer is introduced in this table. The cost of…
- [PRO] Stockpiles - MDT26In this mass diagram option, the different material stockpile areas available for the road works are introduced. When inserting a new one…
- [PRO] Dumps - MDT26In this mass diagram option, the different dumps that are available for the road works are listed. When inserting a new one it will…
- [PRO] Earthworks - MDT26This command is used to carry out movements of materials between cut and fill, as well as account for the different dumps and stockpile…
- [PRO] Draw Mass Diagram - MDT26Next it will optionally request a file to save any type of earthworks that we have been able to make in the road and finally the following…
- [PRO] Mass Diagram Calculation - MDT26The distribution of earthworks throughout the road's route can be analyzed using this option. Also, with a series of tools, the user can…