4.28 [PRO] Earthworks by Embankment Head

[PRO] earthworks by embankment head - MDT25

This command is equivalent to Earthworks by Terrain Elevation, with the peculiarity that only the platform and its slopes are generated where there is a fill volume. No cutting area is generated in the current surface.

An image of the original terrain is shown in the illustration below. It contains a highlighted polyline that defines the fill crown boundary desired.

[PRO] earthworks by embankment head - MDT25 (2)

If the outside of the area defined by the polyline is defined as the slopes' direction with an elevation of 595, the following result is obtained: From the polyline and starting from the elevation of 595, on one side a fill slope has been created and towards the other side a horizontal platform.

[PRO] earthworks by embankment head - MDT25 (3)