11.32 Project Points on Plan

This tool is designed to calculate points over the survey from points selected in the drawing of cross sections. It would be really the opposite of the previous command, so that we would calculate the projection of the designated points on the cross sections drawn.

Project points on plan - MDT25

The program will ask for the following data:

  1. Horizontal Alignment in order to project points

  2. Axis of the cross section drawn

  3. Points to project, selected on the drawing of cross section, that would be automatically drawn on the survey.

After entering these parameters, the program will ask for the block we want to draw on the survey.

This block can be selected from a list.

This process could be repeated as often as cross sections have then drawn.

After finishing the execution of the command, a list of all points calculated will be shown.