Earthworks by Embankment Head
Command to execute in the CAD | |
|---|---|
Vertical menu | MDT26 > Surfaces > Grading > by Embankment Head |
Ribbon menu | Surfaces > Grading > Embankment Head |
Command line |
This command is equivalent to Earthworks by Terrain Elevation, with the peculiarity that only the platform and its slopes are generated where there is a fill volume. No cutting area is generated in the current surface.
An image of the original terrain is shown in the illustration below. It contains a highlighted polyline that defines the fill crown boundary desired.
![[PRO] Earthworks by Embankment Head - MDT26 (3)](/media/213942578/image192.png)
If the outside of the area defined by the polyline is defined as the slopes' direction with an elevation of 595, the following result is obtained: From the polyline and starting from the elevation of 595, on one side a fill slope has been created and towards the other side a horizontal platform.